Run the pump a minimum of 10 – 12 hours per day to ensure adequate filtration and activity of the Mineral Springs unit.
Once a week:
Test the free chlorine residual and the pH. Maintain free available chlorine residual at 1.5 – 3.0 ppm by adjusting the sanitiser output control on the salt chlorinator. Maintain pH at 7.4 – 7.6. Adjust as needed.
Add 1 bag of Salt Pool Sparkle per 50,000 litres to establish an initial free chlorine residual of 1.5 – 3.0 ppm.
Add 40 mL of Protector Salt Pool Algae Inhibitor per 10,000 litres to prevent algae.
Once a month:
Perform a complete water analysis and balance according to ALEX recommendations.
As needed:
Brush and vacuum the pool, and empty skimmer and pump baskets.
Backwash the filter.
Change the sanitiser output controller for varying sanitiser consumption to prevent over or under-chlorination of water. Maintain 1.5 – 3.0 ppm.
Chemically clean the filter with Filter Brite mid-season or as required.
For normal operation, leave the main switch in the AUTO position.