by pool with cocktail.png
cocktails in pool.png
three children in pool.png
5-Minute Work Week Pool Care Program

Run the pump a minimum of 8 - 10 hours per day to ensure adequate filtration and circulation.

Twice a week:

Test the free available chlorine residual and the pH. Maintain 1.5 - 3.0 ppm free available chlorine and 7.4 - 7.6 ppm pH. Adjust as needed.

Once a week:

Replace your Smart Sticks as directed below to maintain a free chlorine residual of 1.5 - 3.0 ppm. 1 Smart Stick per 20,000 litres will maintain approximately 1.5 - 2.0 ppm under normal circumstances.

Add 1 bag of Lite per 50,000 litres to remove undesirable compounds and keep the water sparkling clear.

Add 10 mL of Back-Up II Algae Inhibitor per 10,000 litres to prevent algae growth.

Once a month:

Perform a complete water analysis and balance according to ALEX recommendations.

As required:

Brush and vacuum the pool, and empty skimmer and pump baskets.

Backwash the filter.

Chemically clean the filter with Filter Brite mid-season.